Prof. Dr.-Ing. Jürgen Melzner

Chair

Marienstraße 7a, Room 205
99423 Weimar

phone: +49 (0) 3643 / 58-4585
email: juergen.melzner[at]uni-weimar.de

 

 

 

 

Personal details

Activities and Memberships

Member of "Arbeitskreis Digitalisiertes Bauen", Hauptverband der Deutschen Bauindustrie (free translation: Main Association of the German Construction Industry)
Leader of the BuildingSMART (German Chapter) working group "Arbeitsraum Bau 1 - für bauausführende Unternehmen" (Workroom construction 1 - for construction companies)
Member of the working group "BIM im Baubetrieb" (BIM in construction operations) by Fachausschuss Baubetrieb und Bauwirtschaft im Fachbereichstag Bauingenieurwesen (free translation: Technical Committee Construction Management and Construction Industry in the Departmental Council for Civil Engineering), until 03/2022
Member of "Normungskreis VDI 2552 Building Information Modeling (BIM); Blatt 11 BIM- Informationsaustauschanforderungen" (free translation: Standardization body VDI 2552 Building Information Modeling (BIM); Sheet 11 BIM information exchange requirements)
Member of the panel "Lean Construction in der Lehre" (Lean Construction in Education) by the German Lean Construction Institute (GLCI)
Member of Verein Deutscher Ingenieure, VDI (Association of German Engineers)
Member of buildingSMART

Member of the German Lean Construction Institute (GLCI)

Member of the Technical Committee DIN NA 005-13 FBR „BIM-Building Information Modeling"

 

 

Education

03/2010 – 03/2017  Bauhaus-Universität Weimar
Promotion Dr.-Ing.
01/2012 - 03/2012Georgia Institute of Technology, Georgia, USA
Research stay at the RAPIDS-Laboratory
03/2008 - 10/2010WHL Wissenschaftliche Hochschule Lahr 
Master of Business Administration in General Management (MBA)
(berufsbegleitend)
10/2003 – 09/2007Technical University of Nuremberg Georg Simon Ohm
Dipl. Ing. (FH), civil engineer
Specialization: Structural engineering

Career

Seit 04/2022Lehrstuhlinhaber und Professor für Baubetrieb und Bauverfahren, Bauhaus-Universität Weimar, Fakultät Bauingenieurwesen
09/2019 - 03/2022

Hochschule für angewandte Wissenschaften Würzburg -Schweinfurt, Professur für Digitales Planen und Bauen

04/2015 - 08/2019

Modellbasierte Projektabwicklung, Digitalisierung und Prozessmanagement in einem mittelständischen Bauunternehmen

03/2010 - 03/2015

Wissenschaftlicher Mitarbeiter, Bauhaus-Universität Weimar

10/2007 - 02/2010

Bauleiter in einem mittelständischen Bauunternehmen

03/2001 - 08/2001Industriemechaniker /Metallbau 

Teaching

Construction operations, construction methods and occupational health and safety

Introduction to construction methods as well as machines and equipment for general earthwork, concrete construction, assembly construction and special construction tasks with presentation of the modes of operation as well as the calculation and costing approaches, as well as basics of construction site equipment.

Teaching of general basics for the preparation and design of construction processes: Special features of construction production; work preparation, quantity and cost calculation, effort and performance, presentation and control of processes; scheduling and scheduling control; the human being in the work process (ergonomic basics of construction operations), introduction to the basics of quality and ethics management.

Course-related evidence (as an exam admission requirement).

Integrated course (lectures + seminars).

Construction process control

Students will have a holistic view of construction processes based on the systems approach, as well as the theoretical foundations necessary for this; they will have knowledge of the modeling of construction and material flow processes and the use of simulation for their efficient design.

Starting from a holistic view (systems approach), fundamentals are taught to be able to design construction production processes efficiently. After an introduction, the fundamentals of modeling technological processes are laid and deepened using examples and modeling tools.

Contents of the module:

  • Fundamentals of Production, technology and technological processes
  • Knowledge and application of process modelling,
  • Perform BIM use cases
  • Fundamentals of simulation of construction processes,
  • Application of simulation and optimization in construction operations

Lean Construction Management

The course focusses on:

• Historical development of lean construction

• Lean principles

• Types of waste

• Methods of project and process analysis

• Order and cleanliness – 5S in construction

• Tact planning and Tact control

Projects and Theses

 

Interested students have the possibility to have a project or final thesis supervised by the Chair of Construction Engineering and Management in German or English, preferably on topics provided by the Chair. Final theses on own topics can also be supervised by the Chair. Students are always welcome to present project ideas. 

Projects

Babazadeh, N., Teizer, J., Bargstädt, H.-J., Melzner, J. (2024). “Predictive simulation of construction site noise emissions from heavy equipment.” Smart and Sustainable Built Environment, DOI: 10.1108/SASBE-08-2023-0226.

Li, B., Schultz,C., Teizer J., Golovina O., Melzner J. (2022), Towards a unifying domain model of construction safety, health and well-being: SafeConDM; Advanced Engineering Informatics; Volume 51.  https://doi.org/10.1016/j.aei.2021.101487

Teizer, J., Melzner, J. (2019). „Neue Wege zur Integration von BIM, IoT und Lean Construction in die Bauingenieurausbildung“, Jahresausgabe VDI-Bautechnik 2019/20 der Fachzeitschrift „Bauingenieur“, S.19-25.

Melzner, J. Bargstädt, H.-J.  (2019). Ein Modell zur objektorientierten Gefährdungsbeurteilung im Hochbau, In: Bauingenieur, Juli/August 2019, S. 276-284.

Teizer, J., Melzner, J., Wolf, M., Golovina, O., M., König, M. (2017). „Automatisierte 4D-Bauablaufvisualisierung und Ist-Datenerfassung zur Planung und Steuerung von Bauprozessen“, Jahresausgabe VDI-Bautechnik 2017/18 der Fachzeitschrift „Bauingenieur“, S. 129-135.

Hanff, J., Melzner, J. (2016). “Modellbasiertes Bauprozessmanagement”. Ernst & Sohn Special Building Information Modeling, Berlin.

Teizer, J., Melzner, J. (2015) Sicherheitstechnische Planung von Hoch- und Ingenieurbauprojekten mit Hilfe von Bauwerksinformationsmodellen (BIM), Jahresausgabe VDI-Bautechnik 2015/16 der Fachzeitschrift „Bauingenieur“, S. 128-135, 2015.

Melzner, J., Zhang, S., Teizer, J., Bargstädt, H.-J. (2013). „A case study on automated safety compliance checking to assist fall protection design and planning in building information models, Journal of Construction Management and Economics, http://dx.doi.org/10.1080/01446193.2013.780662

Melzner, J., Teizer, J., Zhang, S., Bargstädt, H.-J. (2013). „Objektorientierte sicherheitstechnische Planung von Hochbauprojekten mit Hilfe von Bauwerksinformationsmodellen“, In: BAUINGENIEUR, Vol. 11, 2013, S. 471-479.

Melzner, J. (2024). Lean Construction Implementation in Germany: Integration of Building Information Modeling & Serious Games Simulation, Building Resilient lnfrastructure (BRI) Towards Sustainable Urban Transition Conference, 27.02.2024, Addis Abeba, Äthiopien.  

Zheng, Y,  Seppänen, O., Seiß, S., Melzner, J. (2023). Testing ChatGPT-Aided SPARQL Generation for Semantic Construction Information Retrieval, CONVR 2023 - Proceedings of the 23rd International Conference on Construction Applications of Virtual Reality, DOI: 10.36253/979-12-215-0289-3.75

Seiß, S., Boden, M., Melzner, J., Zheng, Y., Thibaut, D., El Chamaa, R., (2023). Ontology-Based Construction Inspection Planning: A Case Study of Thermal Building Insulation, CONVR 2023 - Proceedings of the 23rd International Conference on Construction Applications of Virtual Reality, DOI: 10.36253/979-12-215-0289-3.82

Zentgraf, S., Fauth, J., Hagedorn, P., Seiß, S., Smarsly, K., König, M. und Melzner, J. (2023). Ontology-based Workflow and Concept for Building Permit Reviews, The 30th EG-ICE: International Conference on Intelligent Computing in Engineering, 04.-07.07.2023, London. Link:

Mellenthin Filardo, M., Debus, P., Melzner, J., Bargstädt, H.-J. (2023). XML-based Automated Information Requirement Import to a Modelling Environment. In: Broyd, T., Haijiang, L., Lu, Q. (eds.), Proceedings of the 30th EG-ICE: International Conference on Intelligent Computing in Engineering. PDF.

Seiß, S., Lünig, J. N., Melzner, J. (2023). Supporting appraisal cost estimation by linked data. In: Proceedings of the 2023 European Conference on Computing in Construction and the 40th International CIB W78 Conference (EC3 2023). Heraclion, Crete. DOI: 10.35490/EC3.2023.287

Mellenthin Filardo, M., Wiesner, L. H., Melzner, J., Bargstädt, H.-J. (2023). Automated supplement of information requirements for tendering data. In: Proceedings of the 2023 European Conference on Computing in Construction and the 40th International CIB W78 Conference (EC3 2023). Heraclion, Crete. DOI: 10.35490/EC3.2023.247.

Babazadeh, N., Teizer, J., Bargstädt, H.-J., Melzner, J. (2023). Digital twin for control of noise emissions from heavy equipment on construction sites. Proceedings of CIBW099W123, Porto, 211-222, ISBN: 978-972-752-309-2, DOI: 10.24840/978-972-752-309-2.

Melzner, J., Seiß, S. (2023). Ontology-based workflow and concept for Safety inscection of Scaffolding,  Proceedings of CIBW099W123 2023, Universidade Porto – FEUP, 21.-22. June 2023.

Mellenthin Filardo, M., Melzner, J., Bargstädt, H.-J. (2023). Replicating an infrastructure project for professional BIM education. For the 10th International Workshop When Social Science Meets Lean and Digital Technologies: 10 years and beyond, associated with the Global Leadership Forum for Construction Engineering and Management (GLF-CEM) 2023, PDF.

Kress, T. Melzner, J. (2022). Digital Building Twin with Thermographic Information - Identification of Energy Weaknesses for Existing Buildings, International conference on Computing in Civil and Building Engineering (ICCCBE), Cape Town, 26.-28.10.2022.

Kress, T. Melzner, J. (2022). Digital Building Twin with Thermographic Information – Identification of Energy Weaknesses for Existing Buildings“ „2nd International Civil Engineering and Architecture Conference (CEAC 2022)” 11.-14.3.2022.

Alves, S., Melzner, J., Hollermann, S. (2022). "Lean Simulation Game With BIM-Based Progress Monitoring for Takt Control"; In:, Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC). Edmonton, Canada, 27-29 Jul 2022, S. 307-317

Li, B., Schultz, C., Melzner, J., Golovina, O., Teizer, J. (2020). Safe and lean location based construction scheduling”, In: 37th International Symposium on Automation and Robotics in Construction (ISARC 2020), Kitakyushu, Japan.

Melzner, J. (2019). „BIM-based takt-time planning and takt control- requirements for digital construction process management”, In: 36th International Symposium on Automation and Robotics in Construction (ISARC 2019), Banff, Kanada, DOI: https://doi.org/10.22260/ISARC2019/0007

Melzner, J., Sitzberger R. (2019).”BIM versus Lean Construction – zwei Ansätze für ein standardisiertes Bauprozessmanagement, Deutscher Bautechnik-Tag 2019, Stuttgart.

Melzner, J. (2017). „Applying Lean Principals for an integrated process-based approach towards improved safety in building construction”, In: Proceedings of the Winter Simulation Conference (WSC) 2017), Las Vegas, USA.

Melzner, J., (2017). „Acquisition and Processing of Input Data for an object-oriented safety risk simulation in building construction”, In: Proceedings of the Winter Simulation Conference (WSC) 2017), Las Vegas, USA.

Melzner, J., Hanff, J., Teizer, J. (2017). Pattern-based Generation of 4D-Schedules for robust Construction Management, In: Proc. Lean & Computing in Construction Congress (LC3), Vol. 1 (CIB W78), Heraklion, Greece.

Melzner, J., Hanff, J. (2016). “Automatic Generation of 4D-Schedules for reliable Construction Management”. Lake Constance 5D-Conference 2016. 25.-26.10.2016, Konstanz.

Melzner, J. (2016). „Integrating Lean and Safety: A process-based approach towards construction safety”. 16th International Conference on Computing in Civil and Building Engineering (ICCCBE), Osaka 06-08 Juli,Osaka, Japan.

Melzner, J., Bargstädt, H.-J. (2015) „A framework for 3D-Model based Job Hazard Analysis”, In: Proceedings of the Winter Simulation Conference (WSC) 2015, Huntington Beach, USA.

Melzner, J., Feine, I., Hollermann, S., Rütz, J., Bargstädt, H.-J. (2015). The influence of Building Information Modeling on the communication management of construction projects”. In: The 15th International Conference on Construction Applications of Virtual Reality (CONVR 2015), Banff, Kanada.

Feine, I., Melzner, J., Hollermann, S., Rütz, J. (2015). „Der Einfluss von Bauwerks-informationsmodellierung auf das Informationsmanagement von Bauprojekten“. In: Tagungsband 26. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik, Universität Stuttgart.

Melzner, J., Walther, T., Bargstädt, H.-J., (2014). Object-oriented Hazard Analysis in Building Construction Projects”. In: Proceedings of the Second Australasia and South-East Asia Structural Engineering and Construction Conference (ASEA-SEC-2), Bangkok, Thailand.

Hollermann, S., Melzner, J., Schmidt, H. (2014). „Die Integration von Building Information Modelling in die Baubetriebslehre“. In: Tagungsband 25. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik, TU Graz.

Melzner, J., Hollermann, S., Kirchner S., Bargstädt, H.-J. (2013). „Model-based construction work analysis considering process related hazards”. In: Proceedings of the Winter Simulation Conference (WSC) 2013, 08.-11. Dezember 2013, Washington, DC, USA.

Melzner, J., Bargstädt, H.-J., Merz, K., Portilla Kawamura K. (2013). Transdisziplinäres Lernen und Lehren in der Environment-focused Learning and Operative Platform (elop*). In: 1. Symposium zur Didaktik in MINT Fächern, 07.-08. November 2013, Nürnberg.

Hollermann, S., Bargstädt, H.-J., Melzner, J. (2013). „Construction Simulation – Identification of Important Construction Constraints”. In: 30th International Conference on Applications of IT in the ACE Industry (CIB W78 2013), 09.-12. Oktober 2013, Peking, China.

Melzner, J., Merz, K., Portilla Kawamura K., Holliger C., Bargstädt, H.-J. (2013). „Teaching construction project management within an international and trans-disciplinary learning platform”. In: 30th International Conference on Applications of IT in the ACE Industry (CIB W78 2013), 09.-12. Oktober 2013, Peking, China.

Iyer, K.C., Bargstädt, H.-J., Jacob, D.S., Melzner, J. (2013). “Integrating construction project model and safety guidelines for efficient safety planning”. In: Proceedings of the RICS Cobra Conference 2013, 10.-12. September 2013, Neu Delhi, Indien.

Melzner, J., Hollermann, S. (2013). „Alle Facetten des Baubetriebs – BBB-Assistententreffen in Weimar“. In: BAUPORTAL, 09/2013, http://www.BauPortal-digital.de/BauP.09.2013.046

Melzner, J. (2013). „Sicherheitstechnische Planung von Baustellen unter der Nutzung von Bauwerksinformationsmodellen“. In: 24. BBB-Assistententreffen, Hollermann, Melzner (Hrsg.): 24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik, Bauhaus-Verlag, Weimar.

Melzner, J., Bargstädt, H.-J. (2013). „Construction Safety Management based on a 3D Building Model – A review”. In: Proceedings of the CSCE 2013 General Conference, 29. Mai - 01. Juni 2013, Montréal, Kanada.

Melzner, J., Bargstädt, H.-J. (2012). BIM-based Job Hazard Analysis”. The 12th International Conference on Construction Applications of Virtual Reality (CONVR 2012), Lin & Kang (Hrg.), National Taiwan University Press, Taipeh, ISBN 978-986-03-4289-5

Melzner, J., Hollermann, S., Bargstädt, H.-J. (2012). „A multi-criteria decision-support approach for fall protection planning”.  9th European Conference on Product and Process Modelling (ECPPM), Gudnason&Scherer (Hrg.), Taylor & Francis Group, London, ISBN 978-0-415-62128-1

Hollermann, S., Melzner, J., Bargstädt, H.-J. (2012). „BIM – a challenge for communication between parties involved in construction”.  9th European Conference on Product and Process Modelling (ECPPM), Gudnason & Scherer (Hrg.), Taylor & Francis Group, London, ISBN 978-0-415-62128-1

Melzner, J. (2012). „Sicherheitstechnische Planung von Baustellen unter der Nutzung von Bauwerksinformationsmodellen: Ein Erfahrungsbericht vom Forschungsaufenthalt am Georgia Institute of Technology, Atlanta, USA“, 23. BBB-Assistententreffen, Brunk, Osebold (Hrsg.): 23. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik. Düsseldorf: VDI-Verlag, (Fortschritt-Berichte VDI: Reihe 4, Bauingenieurwesen 218), Deutschland, S. 266-273, ISBN 978-3-18-321804-2

Melzner, J., Zhang, S., Teizer, J., Hollermann, S., Bargstädt, H.-J. (2012). „Safety planning based on an object-orientated building model”. In: Proceedings of the 19th International Workshop on European Group for Intelligent Computing in Engineering (EG-ICE), 4.-6. July 2012, Munich, Germany, Borrmann, Geyer, de Wilde & Rafiq (Hrg.), München, Deutschland, ISBN: 978-3-00-038455-4

Hollermann, S., Melzner, J., Bargstädt, H.-J. (2012). „Concept for Scheduling of Bridge Construction Processes Based on Distributed Simulation, In: Proceedings of the 19th International Workshop on European Group for Intelligent Computing in Engineering (EG-ICE), 4.-6. July 2012, Munich, Germany, Borrmann, Geyer, de Wilde & Rafiq (Hrg.), München, Deutschland, ISBN: 978-3-00-038455-4

Melzner, J., Hollermann, S., Elmahdi, A., Hong H. L., Bargstädt, H.-J. (2012). „ Pattern-Based Process Modeling for Construction Management”. 14th International Conference on Computing in Civil and Building Engineering (ICCCBE), V. TELICHENKO, A. VOLKOV and I. BILCHUK (Editors), Moscow 27–29 June, Moscow State University of Civil Engineering (National Research University), Moskau, Russland.  ISBN 978-5-93093-877-7

Hollermann, S., Melzner, J., Bargstädt, H.-J. (2012). „Object-oriented construction process modelling and its advantage for construction site monitoring”. 14th International Conference on Computing in Civil and Building Engineering (ICCCBE), V. TELICHENKO, A. VOLKOV and I. BILCHUK (Editors), Moscow 27–29 June, Moscow State University of Civil Engineering (National Research University), Moskau, Russland. ISBN 978-5-93093-877-7

Melzner, J., Hollermann, S., Bargstädt, H.-J. (2011). „Detailed input-data source for construction process simulation”. The Third International Conference on Advances in System Simulation (SIMUL 2011), 23.-28.10.2011, Barcelona, Spanien.

Melzner, J., Hollermann, S. (2011). Prozessmodelle und Gebäudemodelle als Grundlage für die Simulation von Bauprozessen, 22. BBB-Assistententreffen, 20.-23.07.2011, Wuppertal, Deutschland.

Melzner, J., Ferger, M.: (2023). Buchkapitel in Integrierte Projektabwicklung (IPA) mit BIM und Lean - Termin- und Kostensicherheit durch optimierte Bauverträge, Herausgeber: Till Kemper, Beuth, 1. Auflage, ISBN  978-3-410-30649-8

Teizer, J., Melzner. J. (2021). „BIM im Arbeitsschutz“ In: Building Information Modeling - Technologische Grundlagen und industrielle Praxis,. Borrmann, A., König, M., Koch, C., Beetz, J. (Hrsg.), Springer, S. 577-595, ISBN 978-3-658-33360-7 doi.org/10.1007/978-3-658-33361-4

Teizer, J., Melzner. J. (2018). „BIM for construction safety and health“ In: Building Information Modeling - Technology Foundations and Industry Practice. Borrmann, A., König, M., Koch, C., Beetz, J. (Eds.), Springer, ISBN 978-3-319-92861-6

Melzner, J. (2017). „Ein Modell zur objektorientierten Gefährdungsbeurteilung im Hochbau“, Dissertation, Bauhaus-Universitätsverlag, Weimar. ISBN:978-3-95773-230-9

Teizer, J., Melzner. J. (2015). „BIM im präventiven Arbeits- und Gesundheitsschutz“ In: Building Information Modeling - Technologische Grundlagen und industrielle Praxis,. Borrmann, A., König, M., Koch, C., Beetz, J. (Hrsg.), Springer, ISBN 978-3-658-05605-6

Tagungsband zum 24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik 2013, Schriften der Professur Baubetrieb und Bauverfahren Nr. 26 Hollermann, Melzner (Hrsg.), Bauhaus-Verlag, Weimar. ISBN 978-3-86068-496-2,