199
edits
Line 63: | Line 63: | ||
* it's possible to use any portion of the space, as long as it doesn't interfere with the activities. The space is an assimetrical room, with a terrace on top (http://leap-berlin.tumblr.com/thespace). In the lower left corner are the stairs to the terrace. | * it's possible to use any portion of the space, as long as it doesn't interfere with the activities. The space is an assimetrical room, with a terrace on top (http://leap-berlin.tumblr.com/thespace). In the lower left corner are the stairs to the terrace. | ||
Not depicted is also | Not depicted is also an adjacent black room of approx. 3x3m. | ||
* the following materials are available to use: | * the following materials are available to use: | ||
Line 74: | Line 74: | ||
** Projection wall | ** Projection wall | ||
** other small items might be available, depending from case to case | ** other small items might be available, depending from case to case | ||
* any computer necessary to run the installation has to be provided by the author. | |||
* Most elements of the Pd-Berlin group will be in Weimar. So, the assembly of the installation must be done: | * Most elements of the Pd-Berlin group will be in Weimar. So, the assembly of the installation must be done: |
edits