m (→3D Model) |
|||
Line 6: | Line 6: | ||
== 3D Model == | == 3D Model == | ||
<gallery> | |||
File:Modell3DStellung1.png|position 1 | |||
File:Modell3DStellung2.png|position 2 | |||
</gallery> | |||
[[File:Animation.gif]] | [[File:Animation.gif]] |
Revision as of 08:51, 5 November 2012
Miroscopy stage construction
Approach with 2 wedges. The aim was to find a simple mechanism that allows for high precision. If you tighten the screw the lower wedge moves left and pushes up the upper wedge with the camera on top of it. If you loosen the screw the camera moves down.
Because of its simplicity it would be less susceptible to errors.