194
edits
No edit summary |
No edit summary |
||
Line 26: | Line 26: | ||
<gallery> | <gallery> | ||
File: | File:Combining the mushroom threads growing on rye with the straw.jpg | ||
File:Growth phase_06.01.2023.jpg | |||
File:Filling formwork.jpg | File:Filling formwork.jpg | ||
File:Growth phase_21.12.2022.jpg | |||
File:Filling the building element with straw.jpg | File:Filling the building element with straw.jpg | ||
File:Fully assembled building block.jpg | File:Fully assembled building block.jpg | ||
File:Growth phase of mushrooms outside the formwork.jpg | File:Growth phase of mushrooms outside the formwork.jpg | ||
File:Removing the blocks from the formwork.jpg | File:Removing the blocks from the formwork.jpg | ||
File:Sterilizing the bags.jpg | File:Sterilizing the bags.jpg | ||
Line 38: | Line 38: | ||
File:The result of the two-day work process.jpg | File:The result of the two-day work process.jpg | ||
File:Combining elements into a complex building block.jpg | File:Combining elements into a complex building block.jpg | ||
File:Compressive strength testing of the building element_1.png | File:Compressive strength testing of the building element_1.png | ||
File:Compressive strength testing of the building element_2.png | |||
</gallery> | </gallery> | ||
edits