On the basis of 2D and 3D calculations, we started constructing three segments, which concluded in a continuous bridging at the end of our process. The three different parts are holding the intermediate piece, representing the actual bridge, in position. The main bridging structure is being stabilized by ropes attached to the supporting constructions.