382
edits
(→Time) |
No edit summary |
||
Line 4: | Line 4: | ||
*how fast does this compare to human movements | *how fast does this compare to human movements | ||
*how many turns/intersections do we want in the environment | *how many turns/intersections do we want in the environment | ||
Timeline | |||
Think how the avatar of the human can be incorporated | Think how the avatar of the human can be incorporated | ||
Feedback with human environment so the two are matching | Feedback with human environment so the two are matching | ||
Decide on the lay-out/design of the map | 1. Decide on the lay-out/design of the map. | ||
* How fast do human move? How fast the ants? (Test) | |||
* Which areas do we want to reproduce for the ants? (Weimar, Düsseldorf Park,...) (Discuss) | |||
2. How does the board work. | |||
* technical drawings | |||
* wood | ** general layout | ||
* ''' plexiglas (most logic option because of visibility)''' | ** cleaning the board | ||
* tubes min. 6mm | ** integrating tracking system | ||
* | ** integrating human movement (projection, laser pointer, little robot avatar,...) (discuss) | ||
* | * details | ||
* | ** entrance; docking the nest | ||
** safety plans (air, what if they escape, ...) | |||
** electronics | |||
* material list: | |||
** electronics | |||
*** Laserpointers for human avatar | |||
*** small robot for human avatar | |||
*** projection | |||
** building materials | |||
*** wood | |||
*** ''' plexiglas (most logic option because of visibility)''' | |||
*** plastic tubes min. 6mm | |||
*** screws | |||
*** glue (Holzleim and Hot glue) | |||
* find and prepare maps | |||
** www.schwarzplan.eu or www.mapbox.com, ask some architecture students, Katasteramt, googlemaps etc. | |||
* prepare lasercut file | |||
* building the actual environment | |||
==Activities== | ==Activities== |
edits